Project Description: Crofton Industries designed, fabricated, and installed a sectional floating bulkhead system for the purpose of rehabilitation 50 spillway crest gates. Crofton Industries eventually installed a second floating bulkhead system and continues to provide maintenance services to the spillway gates.