The existing roadway was failing and washing out from around the existing corrugated pipe culverts. Under an emergency contract Crofton was hired prime project and execute the replacement efforts. The project was to drive temporary sheeting, remove asphalt roadway, excavate, set stone base course, three 54” RC pipes, form, pour, strip, wing and abutment walls, rip rap placement, backfilling, compaction, sub-base, and repaving of roadway