Crofton Industries was contracted to install a 35 slip concrete floating dock system. Project site conditions for pile driving were such that the owner was facing a large change order. Through Crofton's innovative design we were able to recycle the removed steel pipe pile from the previous dock system resulting in a savings to the client of approximately $250K.