Project Description: Crofton Industries was awarded a contract to mobilize a floating crane rig, clamshell dredge debris from the exterior of the inlet works, and replace the existing trash racks.
- Mobilization of floating crane rig to remote site.
- Remove debris from in front of the facility intakes.
- Remove and dispose of existing trash racks.
- Install new trash racks.
- All
- Bridge, Pier, & Boat Ramp
- Bulkhead & Shoreline Stabilization
- Demolition
- Dredging
- Fender & Dolphin Installation & Repair
- Marina
- Shoreline Staibilization
- Utility & Transmission
- Water Resource Structure
- Waterfront Facility Improvement