Outlet Conduit and Intake Inspection
College Lake Dam presented difficult challenges for investigation. Through use of jetting, debris location, and specialized equipment, the Crofton Industries team gained access and performed a close visual investigation of the two foot square low level outlet conduit and low level intake.
Project Location
Lynchburg, VA