Dry Dock Access Concrete Bridge and Ramp
The 15’ wide x 94’ long concrete bridge and ramp was designed to increase productivity and efficiency for owner and sub-contractor accessing the owner’s dry dock. Crofton fabricated and installed pile driving templates then drove 22 ea. X 90ft plumb and 6 ea. X 100ft batter, 16” square precast concrete piles. Design and installed concrete false work and forms. Installed reinforcing steel, cast-in-place marine grade concrete. Then set the owner furnish steel dry dock transition ramp, abutment transition connection, mooring devices, and curb.
Project Location
Norfolk, Virginia
Construction Elements
Concrete pile driving, cast-in-place concrete: caps and curb, reinforcing steel placement, concrete placement, concrete form work, false work.