Crofton was contracted to install approximately 460 linear feet of steel sheet pile bulkhead with concrete cap and fascia. Concrete cap and fascia were installed with the use of Dawson sheet pile form system. Additionally, a boat ramp was constructed along with dredging to allow boat access in and around new structures. Finally, new upland site work and rip rap revetment was install to complete the facility upgrades.
Project Location
Wanchese, North Carolina
Construction Elements
Concrete demolition, pile extraction, dredging, new utilities, cast-in-place concrete boat ramp, stone aprons, cantilevered sheet pile wall, rip rap revetment, site construction, cast-in-place concrete bulkhead cap.