Concrete Breasting Dolphin, Bollards, and Gangway
Included the construction of an 8’ x 25’ x 4’ concrete breasting dolphin. Installation of 14 inch square precast concrete piles, four at 86ft long and eight at 90ft long batter piles. Cast-in-place concrete included false work shoring to support 120K lbs. loads, formwork, reinforcing steel and embeds, 5000 psi concrete placement, finishing, and stripping. Other key elements included installation two ship mooring bollards, and 80’ long personnel access gangway.
Project Location
Chesapeake, Virginia