Crofton recently travelled to Florida to begin installing power cables from Georgetown to Drayton Island and then from Drayton Island to Hog Island, all located in Lake George on the St. John’s River. Project managers worked closely with the Florida Department of Environmental Protection to obtain all appropriate permits and partnered with a local shipbuilding company to mobilize Crofton’s floating cable plow rig at their facility on the St. John’s River near Palatka, FL. The crew will consist of ADCI compliant divers with surface supplied diving equipment, a rig foreman, and a certified crane operator. An unexpected addition to the crew, Cranky the alligator (named by residents of Drayton Island), joined as a sidewalk supervisor. She is very strict! The project is suspected to take about 30 days. We are grateful to the entire crew for their commitment to the success of this project!