Concrete Fender Pile System
Attaching steel fender modules to the face of the pier, pile driving 2106 linear feet of 24 inch square concrete piles, attaching concrete piles to the fender modules, and installation of ultra high molecular weight plastic to the face of the piles.
Project Location
Pier 6 at Naval Station Norfolk