Elizabeth River Trail
Construction of a serpentine timber bike and pedestrian path that crosses over a swamp and creek. Pile driving operations were on an active roadway while driving piles in an adjacent swamp. Project was built with domestic materials according to VDOT specifications. Timber pier is approximately 280 linear feet long.
Project Location
Redgate Avenue, Norfolk, Virginia
Construction Elements
Timber Bridge, with timber pile caps, stringers, decking, and handrails. 2 each concrete abutments.